Brent London Borough Council • 26/1643
Two dropped kerbs and EV charger proposed for flats on busy Wembley road
2 & 2A The Avenue, Wembley, HA9 9QJ
Dropped kerbs, parking works, fencing changes and a charging point would be added at The Avenue.
How to comment
The comment period closed on 25 August. The council may still accept a comment before its decision.
- Status
- Consultation closed · awaiting decision
- Type
- full
- Received
- 29 Jun 2026
- Consultation closed
- 25 Aug 2026
ImpactAutomated estimate
Summary
The owner wants to create two driveway crossings at the front of the flats. This would give both flats their own off-street parking space. An electric car charger would also be installed at the front.
The Avenue is one of the busiest roads in this part of Wembley. It carries nearly 30,000 vehicles every day. A new fence is proposed at the rear, and the front garden would be relandscaped with a mix of planting and hard surfacing.
A telegraph pole in the front area would need to be moved to allow the new layout. The council's planning system has flagged that a heritage document may be required but has not been submitted.
About this summary
What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.
What the council wrote
Proposed 2x dropped kerbs for off-street car parking spaces, removal of fencing and relocation of telegraph post, installation of electrical charging point and rear fencing and soft and hard landscaping to front garden to the flats.
What you can do
Search for reference 26/1643 on Brent Council's planning website to leave a comment. The council can look at road safety, parking, and how the change looks on the street. Keep your comment about the building or the area. Views about the applicant will not be considered.