Plotbeacon
Extension checkSign in

Brent London Borough Council • 26/1643

Two dropped kerbs and EV charger proposed for flats on busy Wembley road

2 & 2A The Avenue, Wembley, HA9 9QJ

Dropped kerbs, parking works, fencing changes and a charging point would be added at The Avenue.

How to comment

The comment period closed on 25 August. The council may still accept a comment before its decision.

Comment on the council's website
Status
Consultation closed · awaiting decision
Type
full
Received
29 Jun 2026
Consultation closed
25 Aug 2026

ImpactAutomated estimate

Summary

The owner wants to create two driveway crossings at the front of the flats. This would give both flats their own off-street parking space. An electric car charger would also be installed at the front.

The Avenue is one of the busiest roads in this part of Wembley. It carries nearly 30,000 vehicles every day. A new fence is proposed at the rear, and the front garden would be relandscaped with a mix of planting and hard surfacing.

A telegraph pole in the front area would need to be moved to allow the new layout. The council's planning system has flagged that a heritage document may be required but has not been submitted.

About this summary

What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.

What the council wrote

Proposed 2x dropped kerbs for off-street car parking spaces, removal of fencing and relocation of telegraph post, installation of electrical charging point and rear fencing and soft and hard landscaping to front garden to the flats.

What you can do

Search for reference 26/1643 on Brent Council's planning website to leave a comment. The council can look at road safety, parking, and how the change looks on the street. Keep your comment about the building or the area. Views about the applicant will not be considered.