Brent London Borough Council • 26/1945
Construction management submitted for Phase 4B homes at Grand Union, Wembley
Land Former Northfields, Beresford Avenue, Wembley, HA0 1NW (Known as Grand Union)
Phase 4B building plans set out construction near a school and canal
How to comment
The comment period closed on 24 August. The council may still accept a comment before its decision.
- Status
- Consultation closed · awaiting decision
- Type
- other
- Received
- 30 Jul 2026
- Consultation closed
- 24 Aug 2026
ImpactAutomated estimate
Summary
This application does not propose new buildings. The homes at Grand Union were approved by the council in 2021. This application sets out how building work will be managed for two new blocks in Phase 4B, called K1 and K2.
The site sits next to the Grand Union Canal, which is right next door. Lyon Park Primary School is about a 2-minute walk away. The nearest homes share a boundary with the construction site.
These conditions cover soil testing, lorry routing, and canal bank protection. Getting them approved is the last step before Phase 4B building work can start.
About this summary
What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.
What the council wrote
Details pursuant to conditions 11 (site investigation), 24 (construction method statement (CMS)), 25 (construction environmental management plan (CEMP)), 27 (construction logistics plan (CLP)) and 30 (banks of the river Brent) for Phase 4B buildings K1 and K2 of Removal of condition reference 25/2943 dated 28 April, 2026, for Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary the wording of Condition 39 (energy statement) and removal of Condition 40 (decarbonisation plans for the site-wide heat network) of Hybrid (Part Outline, Part Full) Planning Permission reference 20/2784 dated 15 June, 2021, comprising:Outline planning permission for the demolition of existing buildings and structures on the site, all site preparation works and redevelopment to provide new buildings to accommodate new homes (Use Class C3), flexible commercial uses, new basement level, associated cycle and vehicle parking, new vehicular accesses, associated highway works to Beresford Avenue, landscaping and creation of new public and private open space, ancillary facilitating works, various temporary meanwhile uses, interim works and infrastructure with all matters reserved - appearance, access, landscaping, layout and scale.Detailed planning permission for Phase 3 (Buildings G, H and J) for the demolition of existing buildings and structures, all site preparation and infrastructure works and the development of new homes (Use Class C3) and flexible commercial floorspace; together with new basement level, associated storage, cycle and vehicle parking, new vehicular accesses, associated highway works to Beresford Avenue, landscaping and creation of new public and private open space, ancillary facilitating works.Permission subject to a Deed of Agreement dated 11 June 2021 under Section 106 of the Town and Country Planning Act 1990, as varied under a Deed of Variation (dated the 27th April 2026).APPLICATION SUBJECT TO AN ENVIRONMENTAL STATEMENT.
What you can do
You can comment on the building plans. The council can only look at specific conditions. The main decision to build was made in 2021. Use reference 26/1945 when you contact the council or comment online.