Plotbeacon
Extension checkSign in

Brent London Borough Council • 26/2101

Heating pipes planned for Kilburn schools

Street Record, Kilburn Park Road, London

Heating pipes and cabinets would serve two schools on Kilburn Park Road.

Road works may bring temporary noise, traffic changes, and cabinets outside the two schools.

Written automatically by Plotbeacon.

Status
In progress
Type
full
Received
17 Aug 2026

Summary

New heating pipes would be installed along Kilburn Park Road. Smaller pipes and outdoor cabinets would connect two St Augustine's schools.

The work may cause temporary digging, noise, and traffic changes. Cabinets would remain outside the schools after the work, along with some indoor changes.

The council will decide after the comment period. The heating network has not been built or approved yet.

About this summary

What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.

What the council wrote

Proposed installation of district heating network pipework (Phase 1) and installation of individual building connection pipework and associated Glass Reinforced Plastic (GRP) cabinets to St Augustine's CE High School NW6 5SN and St Augustine's CE Primary School NW6 5XA in connection with the proposed South Kilburn District Heating Network, including associated external and internal works