The Broads Authority • keyval:TK3R77TBLFL00
River quay replacement at Langton
Langton 100 Lower Street Horning Norfolk NR12 8PF
The river quay at Langton would be replaced with timber, steel and plastic.
The river edge would change, with building work and equipment near the water.
Written automatically by Plotbeacon.
How to comment
The comment period closed on 30 September. The council may still accept a comment before its decision.
- Status
- Consultation closed · awaiting decision
- Type
- householder
- Consultation closed
- 30 Sep 2026
Summary
The owner wants to replace the quay at Langton, beside the river. The work would cover about 160 metres.
Some sections would use timber, steel or plastic. Workers would add 26 piles and a steel beam. Nearby people may notice building noise and activity near the water.
The council will decide after the comment period. The supplied details do not say whether work has started.
About this summary
What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.
What the council wrote
Replacement of 160m of timber quay heading, with 26m of steel to river frontage, and 134m of plastic within the lagoon. Install 26no. bottom driven case piles to accept a new steel ring beam.