Plotbeacon
Extension checkSign in

Ealing London Borough Council • 263308CND

Land repair details for Southall buildings

2 The Straight Southall UB1 1QX

Land repair and monitoring details are being checked for buildings G and H.

Nearby people may see checks linked to land repair, but no new work is proposed here.

Written automatically by Plotbeacon.

How to comment

Tell the council what you think. Quote reference 263308CND.

Comment on the council's websiteDeadline: 24 September
Status
Consultation open · 14 days left
Type
other
Received
3 Sep 2026
Consultation ends
24 Sep 2026

Summary

The developer is sending reports about repaired land near buildings G and H. The reports cover checks, changes, and longer-term monitoring.

This application concerns details for a much larger approved site. That site includes homes, shops, restaurants, a hotel, offices, schools, and open spaces. This application does not seek approval for those works again.

The council will decide after the comment period. The larger development was already approved before these details were sent.

About this summary

What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.

What the council wrote

Details of validation/verification report in demonstrating completion of the works set out in the Remediation Strategy together with amendments and longer term monitoring for phase 3 building G and H of Condition 38 of planning permission ref: 171562VAR dated 16/10/2017 for: Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space.