Hackney London Borough Council • 2026/0417
Sauna planned at Castle Climbing Centre
THE CASTLE CLIMBING CENTRE, GREEN LANES, HACKNEY, N4 2HA
A timber shelter would be removed and a temporary sauna built at the climbing centre.
The sauna could bring more visitors, activity, noise, and traffic near the climbing centre.
Written automatically by Plotbeacon.
How to comment
The comment period closed on 30 August. The council may still accept a comment before its decision.
- Status
- Consultation closed · awaiting decision
- Type
- full
- Received
- 25 Feb 2026
- Consultation closed
- 30 Aug 2026
Summary
The applicant wants to remove a timber shelter at The Castle Climbing Centre in Hackney. A timber sauna would then be built in the grounds of a protected old building.
The sauna would be used for a limited time. It could bring more visitors and activity to the site. Nearby people may notice extra noise, traffic, and changes to views around the building.
The council will decide after the public comment period. The supplied details do not say whether work is already built or approved.
About this summary
What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.
What the council wrote
Demolition of existing timber shelter; construction and temporary use of a timber sauna within the grounds of the Grade II* listed former pumping station (The Castle Climbing Centre)