Plotbeacon
Extension check

Rushmoor Borough Council • 26/00500/MISC28

Backup generator planned beside college mast

Telecommunication Mast Salesian College 119 Reading Road Farnborough Hampshire

A backup generator and fuel equipment are planned beside the college mast.

The generator could add equipment, occasional noise and fuel storage near the college mast.

Written automatically by Plotbeacon.

Status
Approved 12 Oct 2026
Type
prior_approval
Received
15 Sep 2026

Summary

The applicant wants to install a permanent backup generator beside the mast at Salesian College. The generator would provide power when needed. Fuel equipment and other small items would also be added.

Neighbours may see more equipment around the mast, including fuel equipment. The generator could make noise when running. The supplied details do not say how often it would run.

The council will decide after the comment period. The applicant is asking the council to confirm this work is allowed. The supplied details do not say whether installation has started.

About this summary

What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.

What the council wrote

Notification under the Electronic Communications Code Regulations 2003 to use PD rights for installation of a permanent 10kVA back-up power generator with associated fuel apparatus and ancillary equipment thereto