Drainage details for Tilbury energy plant
Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU
Drainage details would be approved for the energy plant at Tilbury Docks.
Nothing much would change for neighbours from approving these drainage details.
Written automatically by Plotbeacon.
- Status
- In progress
- Type
- other
- Received
- 4 Sep 2026
Summary
The owner wants to send drainage details for the energy plant at Tilbury Docks. The details cover how water would be handled on the site.
The energy plant was already approved in an earlier decision. These details would not add a new building or change the plant itself.
The council will decide after the comment period. The supplied details do not say whether the plant is already built or operating.
About this summary
What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.
What the council wrote
Application for the approval of details reserved by condition no. 33 (Drainage Scheme) of the deemed planning permision (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power). Condition previosuly dischared in condition clearnce application 23/00452/CONDC