City of York Council • 26/01471/OHL
Power line work on Stockton Lane
STREET RECORD Stockton Lane York
Part of the overhead power line on Stockton Lane would be replaced.
People may notice short-term work on the street and changes to the overhead line.
Written automatically by Plotbeacon.
- Status
- In progress
- Type
- other
- Received
- 7 Aug 2026
Summary
A section of the low-voltage overhead power line on Stockton Lane would be replaced. The new cable would use a different bundled design.
The work may bring short-term vehicles, workers, and noise to the street. The overhead line may look different after the work. The supplied details do not mention road closures or longer-term disruption.
The council will decide after the comment period. The supplied details do not say whether the cable work has already happened or been approved.
About this summary
What the council wrote is the official record. This summary was made automatically by Plotbeacon from the council's notice.
What the council wrote
Replace a section of low voltage overhead line with ABC conductor